£400,000 The project was spread over three floors and involved the upgrade and installation of a new Ortronics UTP Clarity Category 6 structured cabling system. Where possible, existing equipment and cables was re-used. A feature of the installation was the use of the Ortronics Clarity Jak-Pak 6- way outlet boxes to offer a very neat desk end solution. The project also included installation of the highly popular Mighty Mo 6 open patch frames.
Penguin
Structured Data Cabling for Refurbishment at Penguin's HQ
This project was part of the Penguin Publishing refurbishment at their headquarters in the Strand.