Television Centre Apartments
Able were awarded the prestigious contract to design and install a TV/Sat distribution system and a full structured cabling system at the iconic redevelopment.
Read More...Able were awarded the prestigious contract to design and install a TV/Sat distribution system and a full structured cabling system at the iconic redevelopment.
Read More...Able were appointed to carry out the Structured Cabling for the new London Office
Read More...Able were awarded the prestigious project to move 1,000 of Universal’s employees into the entire office space at 4 Pancras Square.
Read More...Coal Drops Yard is a new shopping experience in the heart of King’s Cross, London.
Read More...Able provides a permanent site based team to manage the infrastructure and to plan…
Read More...In three separate projects, Able have cabled Fidelity's London based Data centers.
Read More...Able were chosen after a competitive tender process to supply and install the new structured cabling solution.
Read More...As part of its London re-organisation, Commerzbank built a new 80 cabinet Data Centre at its Gresham Street, London HQ.
Read More...375 Kensington High Street is a new development of 350 luxury homes spread over seven blocks. Able were awarded the work to design and install a site wide integrated IT.
Read More...