Structured Cabling & Moves into New HQ Building

Contract Value

£300,000

Systems
  • Brand-Rex Cat6
  • OM3
  • Cooper B-Line Cabinets
Project Description

Misys were consolidating four regional offices into one new Headquarters building.

The new office required 3,000 Brand-Rex Cat6 outlets installed over three floors, each floor being cabled from two patch rooms.

Able connected the patch rooms through diversely routed OM3 fibre and voice backbones.

In the main computer room, Able managed the migration of 500 users into the new building, arriving from several smaller offices.

The move was scheduled over five weekends, this work included:

  • Providing an asset register of all their computer equipment.
  • Surveys of the old offices to ensure continuity of service in the new location.
  • A full desk moves service into the new building, including patching of services.
  • Connection and test of the desktop equipment.