Fidelity Investments

Structured Cabling of Fidelity's Data Centres

Contract Value

£650,000

Systems
  • SYSTIMAX GigaSPEED XL Cat6
  • SYSTIMAX LazrSPEED OM2 & OM3
Project Description

In three separate projects, Able have cabled Fidelity’s London based Data centres.

In the first project Able supplied and installed thirty data cabinets and the required cabling infrastructure. The initial installation of 4,000 copper links was completed within four weeks. All RJ45 patch panels are of the Avaya Fleximax variety, where standard outlet modules are clipped into the panel.

The second and third projects were similar, but on a larger scale. The third project at Global Switch involved 10,000 links, installed over a period of one month, made possible using off-site pre-termination.

As part of the initial project, Able Installed also 1,000 10Gbit OM2 fibre links, terminated onto SC connector outlets. The later projects used LC connectors.